Tub Surround Tile in Newington, CT
Keep the tub. Lose the ugly walls — rebuilt, waterproofed and tiled in days, not weeks.
A surround re-tile is the highest-leverage job in a Newington bathroom: three walls, one trade, a few days, and the whole room reads renovated. Newington Tub Surround Co. rebuilds tub surrounds exclusively — tear-out, mold check, proper waterproofing, then tile set flat and grouted tight. Your tub stays, your fixtures can stay, and the price stays in the low thousands instead of the teens.

Built for Newington bathrooms
Original Newington tub walls are narrow — two short walls and a plumbing wall — which is why surround re-tiles here finish fast. The failure point is always the same: grout gone soft at the tub line and corners. Half of Newington's tubs are cast iron worth keeping; the walls around them are not. Surround-only re-tile is the town's sweet-spot job. That is exactly the job we do all week: Newington Center, Churchill Park, the Route 176 corridor, Cedar Mountain side — measured free, finished in days, priced in writing before we start.
Tub surround services in Newington
How it goes
- Free measure & fixed written quote
- Tear-out, inspection & mold check
- Cement board + membrane, photographed
- Tile set flat, grouted, sealed & trimmed
Surround tile that suits Newington baths
Six directions Newington tub owners choose between, with honest notes on each.
Ceramic subway 3x6
Light price, classic face.
Vertical stack
Raises low tub ceilings.
Chevron stripe
Movement on the back wall.
Glass mosaic
Glow under bath lighting.
Zellige-style
Handmade character, sealed right.
Porcelain panels
Near-seamless, low grout.
Why Newington tubs come to us
- Surround-only specialists — this one job, all week
- Free measure with moisture check included
- 2–3 day typical completion, tub stays in place
- Written fixed price, photo-documented rough work
Questions Newington homeowners actually ask
Roughly the same upfront — $1,500 to $3,000 — but tile lasts decades and repairs tile-by-tile, while liners typically need replacement in 5–10 years. Per year of service, tile costs far less.
Two to three working days for a standard Newington surround: day one tear-out and waterproofing, days two and three setting, grout and seal. You shower again about 24 hours after grout.
The tub stays in place but is covered and out of service during the work. Plan 3–4 days without that shower; a second bath makes scheduling easy.
Almost always, yes — cast-iron and steel tubs are worth keeping. We protect the tub, re-tile around it, and re-caulk the joint. Only cracked or flexing tubs need replacement.
We meter-test at the quote, open only what's wet, dry and treat the framing, and rebuild on cement board and membrane. You get photos of everything we find before it costs you anything.
Serving Newington & nearby
Based in central Connecticut — Newington is our core, and we travel to the towns around it.